• Drafting and execution of the project of replacement of vertical centrifugal pumps in technical pit.
• Coordination with OCA to perform and validate load tests.
• Design of handling and anchoring system, with adaptation to existing metal structure.
• Coordination of mechanical assembly, hydraulic connection and revision of drive system for operational commissioning.